Athol Daily News Logo

Search Results

All these search terms are true at the same time:

Keyword search: Rail Trail


Commission reviews first phase designs for Rabbit Run Rail Trail
09-30-2024 3:57 PM

By GREG VINE

ATHOL – Representatives of Howard Stein Hudson Engineering met with Athol’s Open Space and Recreation Commission last week to go over what will be in the designs of the Rabbit Run Rail Trail’s first phase.This phase calls for about a mile of trail...

Displaying articles 1 to 5 out of 5 total.
|<
1
>|

Athol receives $275,000 grant for Rabbit Run Rail Trail
07-01-2024 4:26 PM

By GREG VINE

ATHOL – The first steps toward creation of the 6.2-mile long Rabbit Run Rail Trail are about to be taken.The Town of Athol recently announced that it had received a $275,000 MassTrails grant and is contributing a match of nearly $69,000, bringing the...


Athol seeks grant for Rabbit Run land survey
02-28-2024 3:59 PM

By GREG VINE

ATHOL – Planning and Development Director Eric Smith went before the Open Space and Recreation Commission on Tuesday to announce that he has applied for a MassTrails that would allow the town to start work on the proposed Rabbit Run Rail Trail. When...


A vision coming true: Study finds 104-mile rail trail connecting Northampton-Boston would generate millions, increase health
07-16-2023 5:00 PM

By MADDIE FABIAN

By the end of this decade, if not sooner, bicyclists will be able to hop on the rail trail at the J. Elwell Conservation Area in Northampton, cross the Connecticut River, and travel across the state 104 miles on the same path all the way to Boston.As...


State rolls out interactive rail-trail map for users
07-11-2023 5:00 PM

By MADDIE FABIAN

BOSTON — A new interactive Priority Trails Network vision map created by the Massachusetts Trails Team (MassTrails), an interagency government collaboration, provides a centralized account of key shared-use rail trail projects across the state,...


First look at Rabbit Run Rail Trail options
07-05-2023 3:36 PM

By Greg Vine

ATHOL – Representatives of Howard Stein Hudson Associates, a Boston-based planning and engineering firm, have presented a final technical/feasibility memorandum for the proposed Rabbit Run Rail Trail.The trail would run for 6.2 miles from the New...

Displaying articles 1 to 5 out of 5 total.
|<
1
>|

By using this site, you agree with our use of cookies to personalize your experience, measure ads and monitor how our site works to improve it for our users

Copyright © 2023 to 2024 by Newspapers of Massachusetts, Inc. All rights reserved.